Takayasu, Kentaro; Onuki, Kenji*; Kawamoto, Koji*; Takayama, Yusuke; Mikake, Shinichiro; Sato, Toshinori; Onoe, Hironori; Takeuchi, Ryuji
JAEA-Technology 2017-011, 61 Pages, 2017/06
The Groundwater REcovery Experiment in Tunnel (GREET) was put into effect as development of drift backfilling technologies. This test was conducted by making the Closure Test Drift (CTD) recovered with water after carrying out a plug around 40m distance from northern edge face of horizontal tunnel of depth 500m, for the purpose of investigation of recovering process of rock mass and groundwater under the influence of excavation of tunnel. This report presents the efforts of backfilling investigation using bentonite composite soil and execution of backfilling into borehole pits excavated in the CTD which were carried out in fiscal 2014 as a part of GREET, and succeeding observation results inside pits from September 2014 to March 2016.
Takayasu, Kentaro; Takeuchi, Ryuji; Onoe, Hironori
no journal, ,
The Groundwater REcovery Experiment in Tunnel (GREET) is conducted by making the Closure Test Drift (CTD) recovered with water at the depth of 500m. Backfilling test is conducted as a part of GREET to acquire physical property change of the backfill material. Bentonite mixture was constructed into two pits excavated 1m in depth on the floor of the CTD. Hydraulic pressure, soil pressure and moisture content were measured to grasp the groundwater saturation process and the swelling process of backfill material. The moisture content in the pits got almost fully saturated till one month after. During water filling event, both hydraulic pressure and soil pressure reached 3.1 MPa at maximum. The swelling pressure of the backfill was calculated as 0.03-0.09 MPa. Observation inside the pit will be continued, and characteristics of backfill material will be investigated again. Changes of hydraulic pressure and soil pressure will be simulated and the construction method will be validated.